Monday, May 10, 2010
Friday, April 16, 2010
40% CW
CB1 B1B2
CB1 A1A2
1 | 2009570229 | 36 |
2 | 2009789165 | 35 |
3 | 2009901667 | 32 |
4 | 2009738711 | 35 |
5 | 2009578113 | 37 |
6 | 2009907811 | 37 |
7 | 2009365813 | 37 |
8 | 2009751553 | 37 |
9 | 2009106739 | 37 |
10 | 2009118773 | 36 |
11 | 2009345227 | 32 |
12 | 2009701087 | 33 |
13 | 2009126937 | 33 |
14 | 2009113097 | 37 |
15 | 2009365553 | 35 |
16 | 2009922725 | 37 |
17 | 2009954399 | 32 |
18 | 2009950001 | 37 |
19 | 2009580705 | 33 |
20 | 2009521853 | 37 |
21 | 2009984065 | 36 |
22 | 2009352885 | 32 |
CB1 A1A2
1 | 2009571639 | 32 |
2 | 2009180143 | 33 |
3 | 2009187465 | 34 |
4 | 2009726145 | 32 |
5 | 2009313965 | 31 |
6 | 2009980945 | 31 |
7 | 2009330469 | 32 |
8 | 2009569059 | 31 |
9 | 2009178277 | 33 |
10 | 2009720733 | 33 |
11 | 2009191759 | 31 |
12 | 2009938187 | 33 |
13 | 2009560945 | 27 |
14 | 2009554169 | 37 |
15 | 2009314427 | 32 |
16 | 2009395445 | 32 |
17 | 2009903503 | 27 |
18 | 2009993703 | 27 |
19 | 2009135909 | 37 |
20 | 2009907931 | 34 |
21 | 2009982889 | 37 |
22 | 2009335863 | 32 |
Friday, April 2, 2010
Tuesday, February 23, 2010
Wednesday, February 10, 2010
Assignment 3.....CB1B1B2
YOUR TEAM IS ASSIGNED TO DO A FEASIBILITY STUDY ON THE CONSTRUCTION OF A NEW BUILDING (HOSTEL/HOTEL/HIGH RISE BUILDING) IN PULAU PINANG. THE PROBLEM WITH THAT AREA IS ...............(each group will be given a different problem).AS A TEAM YOU HAVE TO DECIDE ON THE MOST SUITABLE WAY/S TO SOLVE THE EXISTING PROBLEM. PROVIDE YOUR SOLUTION/S AND PRESENT IT TO THE CLASS.
- introduction
- details of the location
- details of the building
- types of construction
- model of the building
- describe the problems
- solutions- explanation must be included
- reasons for the solution/s
- recommendations
- conclusion
- references
group 1 (SWAMPY)
akmalina bt ab rahman
nur aqilah aziz
anis bt azmi
group 2 (PADDY FIELD)
siti shahidatul naqiah shafie
nurul atiqah seri
adnie baharin
group 3 (ROCKY AREA)
fatin nadya mohamad ismadi
nurain rosdi
nurfaradiba farhana bt harun
group 4 (PEAT SOIL AREA)
siti athirah
siti asma
nor shafiqa
group 5 (SANDY AREA)
syed nurfahmi effendi b syed abdul malik
hakimi b ali
kamarul arifin b ahmad
naim b abd karim
group 6 (CLAY AREA)
megat iqbal faris b zainuddin
mohammad asraf b abdul halim
ahmad syukri hayat b mohamad zamri
group 7 (HILLY AREA)
muhammad shakir b md saad
muhamad sukri b mohd mabrud
mohd fakri b adnan
Tuesday, February 9, 2010
Assignment 3.....CB1A1A2
YOUR TEAM IS ASSIGNED TO DO A FEASIBILITY STUDY ON THE CONSTRUCTION OF A NEW BUILDING (HOSTEL/HOTEL/HIGH RISE BUILDING) IN PULAU PINANG. THE PROBLEM WITH THAT AREA IS ...............(each group will be given a different problem).
AS A TEAM YOU HAVE TO DECIDE ON THE MOST SUITABLE WAY/S TO SOLVE THE EXISTING PROBLEM. PROVIDE YOUR SOLUTION/S AND PRESENT IT TO THE CLASS.
group 1 (swampy area)
siti nadhirah bt hamdan
amirah bt ali chew
hannan bt nasharudin
group 2 (paddy field)
nur shahida bt sazali
masyitah bt muhammad shah
siti saidatul syafika bt mohd zahir
group 3 (rocky area)
nur fatimah
nur hidayah
hanisah
group 4(peat soil area)
wan abdul aziz b wan nashrudin
mohamad hamizan b mohamed @hizam
muhammad fathi b zainal bahrin
group 5( sandy area)
mohd azman b salleh
nik abdul aziz b nik abdullah badawi
wan muhammad imran b wan kamarudin
group 6( clay area)
ahmad murzik
ahmad fauzi
group 7 (hilly area)
zuhaili
haziq
faliq
AS A TEAM YOU HAVE TO DECIDE ON THE MOST SUITABLE WAY/S TO SOLVE THE EXISTING PROBLEM. PROVIDE YOUR SOLUTION/S AND PRESENT IT TO THE CLASS.
- introduction
- details of the location
- details of the building
- types of construction
- model of the building
- describe the problems
- solutions- explanation must be included
- reasons for the solution/s
- recommendations
- conclusion
- references
group 1 (swampy area)
siti nadhirah bt hamdan
amirah bt ali chew
hannan bt nasharudin
group 2 (paddy field)
nur shahida bt sazali
masyitah bt muhammad shah
siti saidatul syafika bt mohd zahir
group 3 (rocky area)
nur fatimah
nur hidayah
hanisah
group 4(peat soil area)
wan abdul aziz b wan nashrudin
mohamad hamizan b mohamed @hizam
muhammad fathi b zainal bahrin
group 5( sandy area)
mohd azman b salleh
nik abdul aziz b nik abdullah badawi
wan muhammad imran b wan kamarudin
group 6( clay area)
ahmad murzik
ahmad fauzi
group 7 (hilly area)
zuhaili
haziq
faliq
Wednesday, February 3, 2010
PENGUMUMAN dari pejabat FKA, tkt 6, BPerdana
salam semua ECM407 .......
KAD APA
Kepada semua pensyarah dan staf sokongan di minta untuk mengambil KAD APA di pejabat fakulti.
Diminta juga semua pensyarah memaklumkan kepada semua pelajar FKA supaya mengambil KAD APA di pejabat fakulti.
Sekian terima kasih
Azmira Arshad
KAD APA
Kepada semua pensyarah dan staf sokongan di minta untuk mengambil KAD APA di pejabat fakulti.
Diminta juga semua pensyarah memaklumkan kepada semua pelajar FKA supaya mengambil KAD APA di pejabat fakulti.
Sekian terima kasih
Azmira Arshad
Subscribe to:
Posts (Atom)