Assignment 3.....CB1A1A2

YOUR TEAM IS ASSIGNED TO DO A FEASIBILITY STUDY ON THE CONSTRUCTION OF A NEW BUILDING (HOSTEL/HOTEL/HIGH RISE BUILDING) IN PULAU PINANG. THE PROBLEM WITH THAT AREA IS ...............(each group will be given a different problem).
AS A TEAM YOU HAVE TO DECIDE ON THE MOST SUITABLE WAY/S TO SOLVE THE EXISTING PROBLEM. PROVIDE YOUR SOLUTION/S AND PRESENT IT TO THE CLASS.
  • introduction
  • details of the location
  • details of the building
  • types of construction
  • model of the building
  • describe the problems
  • solutions- explanation must be included
  • reasons for the solution/s
  • recommendations
  • conclusion
  • references


group 1 (swampy area)
siti nadhirah bt hamdan
amirah bt ali chew
hannan bt nasharudin

group 2 (paddy field)
nur shahida bt sazali
masyitah bt muhammad shah
siti saidatul syafika bt mohd zahir

group 3
(rocky area)
nur fatimah
nur hidayah
hanisah

group 4
(peat soil area)
wan abdul aziz b wan nashrudin
mohamad hamizan b mohamed @hizam
muhammad fathi b zainal bahrin

group 5
( sandy area)
mohd azman b salleh
nik abdul aziz b nik abdullah badawi
wan muhammad imran b wan kamarudin


group 6
( clay area)
ahmad murzik
ahmad fauzi


group 7
(hilly area)
zuhaili
haziq
faliq