YOUR TEAM IS ASSIGNED TO DO A FEASIBILITY STUDY ON THE CONSTRUCTION OF A NEW BUILDING (HOSTEL/HOTEL/HIGH RISE BUILDING) IN PULAU PINANG. THE PROBLEM WITH THAT AREA IS ...............(each group will be given a different problem).
AS A TEAM YOU HAVE TO DECIDE ON THE MOST SUITABLE WAY/S TO SOLVE THE EXISTING PROBLEM. PROVIDE YOUR SOLUTION/S AND PRESENT IT TO THE CLASS.
  • introduction
  • details of the location
  • details of the building
  • types of construction
  • model of the building
  • describe the problems
  • solutions- explanation must be included
  • reasons for the solution/s
  • recommendations
  • conclusion
  • references

group 1 (SWAMPY)
akmalina bt ab rahman
nur aqilah aziz
anis bt azmi

group 2 (PADDY FIELD)

siti shahidatul naqiah shafie
nurul atiqah seri
adnie baharin

group 3
(ROCKY AREA)
fatin nadya mohamad ismadi
nurain rosdi
nurfaradiba farhana bt harun

group 4
(PEAT SOIL AREA)
siti athirah
siti asma
nor shafiqa

group 5
(SANDY AREA)
syed nurfahmi effendi b syed abdul malik
hakimi b ali
kamarul arifin b ahmad
naim b abd karim

group 6
(CLAY AREA)
megat iqbal faris b zainuddin
mohammad asraf b abdul halim
ahmad syukri hayat b mohamad zamri

group 7 (HILLY AREA)

muhammad shakir b md saad
muhamad sukri b mohd mabrud
mohd fakri b adnan

Tuesday, February 9, 2010

Assignment 3.....CB1A1A2

YOUR TEAM IS ASSIGNED TO DO A FEASIBILITY STUDY ON THE CONSTRUCTION OF A NEW BUILDING (HOSTEL/HOTEL/HIGH RISE BUILDING) IN PULAU PINANG. THE PROBLEM WITH THAT AREA IS ...............(each group will be given a different problem).
AS A TEAM YOU HAVE TO DECIDE ON THE MOST SUITABLE WAY/S TO SOLVE THE EXISTING PROBLEM. PROVIDE YOUR SOLUTION/S AND PRESENT IT TO THE CLASS.
  • introduction
  • details of the location
  • details of the building
  • types of construction
  • model of the building
  • describe the problems
  • solutions- explanation must be included
  • reasons for the solution/s
  • recommendations
  • conclusion
  • references


group 1 (swampy area)
siti nadhirah bt hamdan
amirah bt ali chew
hannan bt nasharudin

group 2 (paddy field)
nur shahida bt sazali
masyitah bt muhammad shah
siti saidatul syafika bt mohd zahir

group 3
(rocky area)
nur fatimah
nur hidayah
hanisah

group 4
(peat soil area)
wan abdul aziz b wan nashrudin
mohamad hamizan b mohamed @hizam
muhammad fathi b zainal bahrin

group 5
( sandy area)
mohd azman b salleh
nik abdul aziz b nik abdullah badawi
wan muhammad imran b wan kamarudin


group 6
( clay area)
ahmad murzik
ahmad fauzi


group 7
(hilly area)
zuhaili
haziq
faliq

Wednesday, February 3, 2010

PENGUMUMAN dari pejabat FKA, tkt 6, BPerdana

salam semua ECM407 .......

KAD APA
Kepada semua pensyarah dan staf sokongan di minta untuk mengambil KAD APA di pejabat fakulti.

Diminta juga semua pensyarah memaklumkan kepada semua pelajar FKA supaya mengambil KAD APA di pejabat fakulti.


Sekian terima kasih
Azmira Arshad

Tuesday, February 2, 2010

PENGUMUMAN..PERHATIAN

TEST 1
28/02/2010
10.00 pagi - 12.00 pagi
Laman Perdana
Chapter 1 - world of engineering
Chapter 2 - characteristic of creator and inventor
Chapter 3 - creative problem solving


TEST 2
10/04/2010
3.00 petang - 5.00 petang
Laman Perdana
Chapter 4 - challenges to engineering
Chapter 5 - decision making
Chapter 6 - best and elegant solution