Assignment 3.....CB1B1B2

YOUR TEAM IS ASSIGNED TO DO A FEASIBILITY STUDY ON THE CONSTRUCTION OF A NEW BUILDING (HOSTEL/HOTEL/HIGH RISE BUILDING) IN PULAU PINANG. THE PROBLEM WITH THAT AREA IS ...............(each group will be given a different problem).
AS A TEAM YOU HAVE TO DECIDE ON THE MOST SUITABLE WAY/S TO SOLVE THE EXISTING PROBLEM. PROVIDE YOUR SOLUTION/S AND PRESENT IT TO THE CLASS.
  • introduction
  • details of the location
  • details of the building
  • types of construction
  • model of the building
  • describe the problems
  • solutions- explanation must be included
  • reasons for the solution/s
  • recommendations
  • conclusion
  • references

group 1 (SWAMPY)
akmalina bt ab rahman
nur aqilah aziz
anis bt azmi

group 2 (PADDY FIELD)

siti shahidatul naqiah shafie
nurul atiqah seri
adnie baharin

group 3
(ROCKY AREA)
fatin nadya mohamad ismadi
nurain rosdi
nurfaradiba farhana bt harun

group 4
(PEAT SOIL AREA)
siti athirah
siti asma
nor shafiqa

group 5
(SANDY AREA)
syed nurfahmi effendi b syed abdul malik
hakimi b ali
kamarul arifin b ahmad
naim b abd karim

group 6
(CLAY AREA)
megat iqbal faris b zainuddin
mohammad asraf b abdul halim
ahmad syukri hayat b mohamad zamri

group 7 (HILLY AREA)

muhammad shakir b md saad
muhamad sukri b mohd mabrud
mohd fakri b adnan