Assignment 3.....CB1B1B2
YOUR TEAM IS ASSIGNED TO DO A FEASIBILITY STUDY ON THE CONSTRUCTION OF A NEW BUILDING (HOSTEL/HOTEL/HIGH RISE BUILDING) IN PULAU PINANG. THE PROBLEM WITH THAT AREA IS ...............(each group will be given a different problem).AS A TEAM YOU HAVE TO DECIDE ON THE MOST SUITABLE WAY/S TO SOLVE THE EXISTING PROBLEM. PROVIDE YOUR SOLUTION/S AND PRESENT IT TO THE CLASS.
- introduction
- details of the location
- details of the building
- types of construction
- model of the building
- describe the problems
- solutions- explanation must be included
- reasons for the solution/s
- recommendations
- conclusion
- references
group 1 (SWAMPY)
akmalina bt ab rahman
nur aqilah aziz
anis bt azmi
group 2 (PADDY FIELD)
siti shahidatul naqiah shafie
nurul atiqah seri
adnie baharin
group 3 (ROCKY AREA)
fatin nadya mohamad ismadi
nurain rosdi
nurfaradiba farhana bt harun
group 4 (PEAT SOIL AREA)
siti athirah
siti asma
nor shafiqa
group 5 (SANDY AREA)
syed nurfahmi effendi b syed abdul malik
hakimi b ali
kamarul arifin b ahmad
naim b abd karim
group 6 (CLAY AREA)
megat iqbal faris b zainuddin
mohammad asraf b abdul halim
ahmad syukri hayat b mohamad zamri
group 7 (HILLY AREA)
muhammad shakir b md saad
muhamad sukri b mohd mabrud
mohd fakri b adnan
No comments:
Post a Comment